The Government of India has laid emphasis for capacity improvement of Railway sector with added rail length, dedicated freight corridor, adding additional tracks, gauge conversion etc for a sustainable, economical, efficient, safe, reliable, environment friendly railway transport infrastructure.
Our contribution to the Railway sector development in India is significant in both Green field and brown field Railway projects. We have logged over 10000km of Railway track length in the field of design, construction, track rehabilitation, yard capacity improvement, dedicated industrial corridors, railway infrastructure for industries, operation and maintenance of railway infrastructure etc.
We have also designed & supervised implementation of ballast less tracks and road cum track structures, track laying in tunnels in curves etc. We continually explore the practical application of advanced technologies to provide innovative, cost-effective and appropriate project solutions.
CAPABILITIES
We have the credit of completing more than 15 projects across India.We undertake, railway network analysis, track capacity analysis, feasibility studies, detail engineering design as well as construction supervision of Railway projects.
Our firm provides 'one stop solution' for planning, design and construction of Railway infrastructures with added inhouse competency for carrying out Topographical Survey, Hydrological survey and Geo-technical investigation; being pre-requisite for detail engineering.
We also provide Railway infrastructure solutions to Industries.
Demand analysis
Route selection
Private siding
FLS
Techno Economic Feasibility Studies
Detailed Project Report
Terminal & Yard Planning
Cost estimation
supervision assignments
Carrying out final location survey, geotechnical studies, design, preparation drawings & other preliminary activities’ in connection with construction of New BG line between Dungarpur- Ratlam via Banswara
Carrying out final location survey, geotechnical studies, preparation of GAD of bridges, drawings & other preliminary, activities in connection with construction of New Line between Rohtak - Meham - Hansi
Carrying out Geotech investigation,
designing of foundation in connection with
Bangurgram to Guriya & Marwar to Rani
Doubling projects and Various shifting of
utility works of DFCCIL & LHS works
between Kishangarh & Palanpur stations
Final Location Survey of Proposed Doubling
of Line between Mudkhed – Parbhani
Final location survey for proposed new BG
line between Nadikudi and Sri Kalahasti
Final location survey for GwaliorSeopurkalan
Gauge conversion (N.G to B.G)
with extension to Kota
Final Location Survey, geotechnical studies,
preparation of design, drawing and other
preliminary activities, in connection with
Gauge conversion between Dholpur -
Sirmuttra and extension upto Gangapur City
Final location survey for Gauge Conversion
between Punalur and Sengottaii.
Conducting Final Location survey, Marking
Centreline, SoilI investigation and detailed
design engineering for proposed Doubling of
Tamluk(Junction Cabin) -Basulya sutahata
Section